Holy Redeemer Church
El Dorado, Arkansas
Phase two of Holy Redeemer's renovation was a new altar and ambo. The ambo was completed first (q.v.) and the altar was installed and dedicated on Holy Thursday as part of the beginning of Triduum. The altar and ambo are distinctive pieces, but share design elements which will also be picked up by the presider's chair. The top is 48"x60" and the altar stone is concealed in a special drawer.
Year: 2006
Material: Cherry